CPARS Receiving and Other Common Receiving Procedures

CPARS receiving is the final phase of a government contractor performance evaluation within the Contractor Performance Assessment Reporting System (CPARS). Here, the contractor is officially notified of their evaluation and given the opportunity to review and comment.
This process is a critical part of government contracting, working in tandem with other common receiving procedures like physical goods inspection and invoice verification. These procedures often begin in a centralized mailroom. This comprehensive process ensures accountability and contract compliance.
For example, a company named "CyberSec Inc.," is contracted to deliver and install 50 secure servers for the Department of Defense. The contract requires a series of inspections and verifications upon delivery.
The physical receiving team, often managed by the mailroom, will verify that all 50 servers have been delivered and are undamaged. This is a common receiving procedure, frequently documented via a receiving report.
As the project progresses, the government's project manager will document CyberSec Inc.'s performance on aspects such as the quality of installation, adherence to schedule, and overall management. At the end of the contract, this performance is compiled into a formal CPARS report.
The CPARS receiving process then begins when CyberSec Inc. is officially notified that this evaluation is ready for their review and comments.

What are the Stages of CPARS Receiving?
- Notification: Once the government's Assessing Official (AO), often a Contracting Officer's Representative (COR) or Program Manager, finalizes the performance evaluation, the CPARS system automatically sends an email notification to the designated Contractor Representative. This email signals that an evaluation is ready for review.
- Contractor Review and Comments: The contractor is afforded a specific period, typically 14 calendar days, to review the CPARS report. During this time, the Contractor Representative can:
- Review the ratings (e.g., Exceptional, Very Good, Satisfactory, Marginal, Unsatisfactory).
- Read the narrative comments provided for each evaluation area, such as quality, schedule, cost control, and management.
- Provide their own comments, rebutting statements, or additional information.
- Concur or non-concur with the government's assessment.
- Finalization: The evaluation is then returned to the Assessing Official. If the contractor concurs, the evaluation is closed and becomes part of the official record. If the contractor does not concur, the evaluation is forwarded to a Reviewing Official (a higher-level manager) for a final determination. The contractor's comments are always part of the final, official record, regardless of whether they are concurred with.
This structured process ensures a system of checks and balances, providing contractors a fair opportunity to voice their perspective and ensuring the final report is as objective and accurate as possible.
Other Common Receiving Procedures
Beyond the formal CPARS process, "receiving" in government contracting also refers to the procedures for accepting goods, services, or deliverables. This is a basic part of the contract lifecycle that verifies the contractor has met their obligations before payment is processed. The physical receiving process for tangible goods typically begins in a centralized mailroom, making it a critical first step in the chain of accountability.
Receiving is more than just a clerk signing for a package. It's a multi-stage process governed by specific regulations to ensure the government receives exactly what it paid for. This is where the initial data for the entire contract administration process is created, from invoice approval to final CPARS reporting.

1. Initial Receipt and Physical Inspection
This is the tangible first step. The contractor delivers the goods to the mailroom or a dedicated receiving dock. The mailroom staff, or a designated receiving official, must sign for the delivery. This is the official date of receipt, a key factor for determining compliance with delivery deadlines. During this phase, the mailroom's representative performs a preliminary inspection.
- Verification: The number of boxes or pallets is counted and compared to the carrier's bill of lading or packing slip.
- Condition Check: The shipment is visually inspected for obvious signs of damage, like torn boxes or crushed containers. Any damage is noted on the carrier's document before the driver leaves.
2. Documentation and Verification against the Purchase Order (PO)
Once the delivery is physically received, the process moves to documentation, often managed directly by mailroom personnel. The receiving official creates a Receiving Report, which formally logs the items' arrival.
- Packing Slip Match: The contents of each package are verified against the packing slip to ensure the correct items and quantities were shipped.
- PO Conformity: The items are then checked against the Purchase Order (PO). This is a crucial step to confirm that the items received are the exact make, model, and quantity specified in the contract. Discrepancies at this stage can lead to a hold on payment or a return of the goods.
3. Formal Acceptance and Quality Assurance
Following the initial inspection, a more detailed quality assurance check may be performed by a technical expert. This step determines if the goods meet the specific quality and performance standards outlined in the contract.
- Testing and Inspection: For high-value or mission-critical items (e.g., specialized equipment, software, or prototypes), a technical expert may perform functional testing.
- Final Acceptance: Only after a final determination that the goods or services meet all contractual requirements is a formal Acceptance issued. This can be a separate document or an official electronic certification, and it is the signal to the finance department to process the invoice.
4. Invoice Processing and the Three-Way Match
The final stage of the receiving process is financial. The contractor submits an invoice, which is then verified by the government. The finance department uses the principles of the Three-Way Match to ensure accuracy before payment is released. The mailroom plays a critical role here as well, handling and routing the physical invoice as it arrives.
- Invoice vs. PO: The invoice amount, item descriptions, and quantity are matched against the original Purchase Order.
- Invoice vs. Receiving Report: The invoice is matched against the Receiving Report, which was initiated by the mailroom, to confirm that the goods were actually delivered and accepted. If all three documents align, the invoice can be approved for payment. This process is often automated through platforms like the U.S. Treasury's Invoice Processing Platform (IPP).
These procedures, while seemingly simple, are essential for maintaining financial control and providing the hard data that informs a contractor's overall performance evaluation in systems like CPARS.
Importance and Interrelation
Both CPARS receiving and common receiving procedures are vital to the integrity of government contracting. While the three-way match focuses on the transactional accuracy of a single delivery, CPARS receiving provides a long-term, strategic view of overall contractor performance. A positive CPARS evaluation is often the result of a contractor consistently excelling at the day-to-day common receiving and delivery procedures.

These foundational steps, managed by mailroom and receiving personnel, are the source of the data for both financial reconciliation and performance reporting. Therefore, proper mailroom management is not just about sorting packages, but a crucial first step that ensures the accuracy and integrity of the data that informs the entire contract lifecycle. The efficiency and accuracy of a well-managed mailroom are the building blocks that ensure taxpayers' money is spent effectively, and that future contract awards are based on a reliable record of a contractor's ability to deliver on their promises.